Electric Distribution
Georgian State Electrosystem Distribution System
Project
Georgian State Electrosystem Distribution SystemCustomer
SiemensScope of Work
Complete Building Design and Manufacturing, Insulation, Lining, Ancillary Platforms, Stairs and Steel Support Columns, Spreader Beam, Providing Installation and Test Area, Transportation and Installation SupervisionUNIT | CAP (kV) | LENGTH (mm) | WIDTH (mm) | HEIGHT (mm) | AREA (m2) |
---|---|---|---|---|---|
GARDABANI 500KV SUBSTATION | 6 |
15.000 |
3.100 |
3.480 |
47 |
MARNEULI 220KV SUBSTATION | 10 |
20.000 |
3.100 |
3.480 |
62 |
RUSTAVI 220KV SUBSTATION | 10 |
15.000 |
3.100 |
3.480 |
47 |
RUSTAVI 220KV SUBSTATION | 10 |
15.000 |
3.100 |
3.480 |
47 |
GURJAANI 220KV SUBSTATION | 10 |
14.500 |
3.100 |
3.480 |
45 |
ZUGDIDI 220KV SUBSTATION | 10 |
16.000 |
3.100 |
3.480 |
50 |
MENJI 220KV SUBSTATION | 10 |
22.500 |
3.100 |
3.480 |
70 |
BATUMI 220KV SUBSTATION | 10 |
17.500 |
3.100 |
3.480 |
54 |
BATUMI 220KV SUBSTATION | 35 |
17.000 |
4.350 |
4.080 |
74 |
GORI 220KV SUBSTATION | 10 |
21.000 |
3.100 |
3.480 |
65 |
GORI 220KV SUBSTATION | 35 |
18.000 |
4.350 |
4.080 |
78 |
KHASHURI 220KV SUBSTATION | 35 |
21.500 |
4.350 |
4.080 |
94 |
GLDANI 220KV SUBSTATION | 35 |
12.000 |
3.100 |
4.080 |
52 |
TSKALTUBO 220KV | 10 |
12.000 |
3.100 |
3.480 |
37 |
ZESTAFONI 500KV SUBSTATION | 10 |
18.500 |
3.100 |
3.480 |
57 |
JANDARA SUBSTATION | 10 |
13.250 |
3.300 |
3.650 |
44 |
Total
|
921 |